There are 12 Major Ports in the country. Port-wise Performance during 2016-17 is given as under:                                                                                                                 
Sl.No
Major Port
Traffic
Handled
(In MT)
Avg. Pre-berthing Time on Port A/c
(In Hrs.)
Avg. Total Turn-round Time
(In Days)
Avg. Output
Per Ship
Berthday
(Tonnes)

1
Kolkata Port Trust






- Kolkata Dock System*
16.17
0.79
4.73
4200


- Haldia Dock Complex*
34.14
21.11
3.45
7491

2
Paradip
88.96
13.85
4.99
23727

3
Visakhapatnam
61.02
0.41
3.75
13069

4
Kamarajar (Ennore)
30.02
0.02
2.70
22924

5
Chennai
50.21
0.84
2.51
15888

6
V.O. Chidambaranar
38.46
8.88
4.40
10456

7
Cochin
25.01
0.00
1.99
17450

8
New Mangalore
39.95
3.28
2.35
17094

9
Mormugao
33.18
9.57
4.51
13461
10
Mumbai
63.05
2.16
3.27
8413
11
JNPT
62.15
6.96
2.01
23316
12
Kandla
105.44
2.16
4.40
18464

Overall:
647.76
5.77
3.43
14576
            (*)  Kolkata Dock System and Haldia Dock Complex are parts of Kolkata Port Trust                    
The performance of Major Ports during 2012-13 and 2016-17 has been as under :
Performance Parameters
2012-13
2016-17
Traffic Handled (In Million Tonnes)
545.79
647.76
Avg. Pre-berthing Time on Port A/c
(In Hrs.)
12.17
5.77
Avg. Total Turn-round Time
(In Days)
4.24
3.43
Avg. Output Per Ship Berthday
(Tonnes)
11800
14576

This information was given by Minister of State for Shipping and Road Transport and Highways Shri Pon. Radhakrishnan in a written reply to a question in the Lok Sabha today (August 10, 2017).



Courtesy: pib.nic.in

No comments:

Extension of Emergency Credit Line Guarantee Scheme through ECLGS 2.0 for the 26 sectors identified by the Kamath Committee and the healthcare sector

Extension of the duration of Emergency Credit Line Guarantee Scheme (ECLGS) 1.0 The Government has extended Emergency Credit Line Guarantee ...