Prime minister’s package for bihar -2015 August 18, 2015
I. National Highways
A. Projects under process for award/bidding stage
Sl No.
|
NH No.
|
Project Name
|
Length (km)
|
TPC (in Rs. Cr.)
|
1
|
82
|
Biharsharif – Barbigha – Mokama section of NH-82,NHDP Phase-IV
|
55
|
399.54
|
2
|
30
|
4- laning of Patna-Koilawar section of NH 30
|
33
|
492
|
3
|
30&84
|
4- laning of Koilawar- Bhojpur section of NH-30 and NH-84
|
44
|
750
|
4
|
84
|
4 laning of Bhojpur-Baxar section of NH-84
|
48
|
595
|
5
|
31
|
4 laning of Bakhtiyarpur-Mokama section of NH-31
|
45
|
970
|
6
|
31
|
New 4-laned bridge across river Ganga at Mokama on NH-31
|
09
|
520
|
7
|
31
|
4lane of Simaria – Khagaria on NH-31,NHDP Phase-III
|
60
|
1062.58
|
8
|
30A
|
km 0.0-km 69.6 of Fatua-Harnaut-Barh section of NH-30A
|
71.8
|
591.2
|
9
|
104
|
Upgradation of Sheohar-Sitamarhi-Jaynagar-Narahiya (km 40-217) of NH 104 in three packages
|
179.95
|
701.44
|
10
|
106
|
Upgradation of Birpur-Bihpur (km 0-106) section of NH-106
|
105.2
|
575.34
|
11
|
85
|
2-laning with paved shoulder of Gopalganj - Chhapra section
|
94
|
748.06
|
12
|
28B
|
Widening and strengthening to 2-lane with paved shoulder & geometric improvement Betiah -Khushinagar Section from km 25.00 to km 40.00 on EPC mode
|
15.00
|
88.61
|
13
|
28B
|
Strengthening and Widening to 2 Lane with Paved Shoulder from km 65 to 97 on EPC mode
|
33.00
|
206.80
|
14
|
102
|
2-laning with paved shoulder of Chhapra - Rewaghat - Muzaffarpur
|
73
|
420.58
|
15
|
133
|
Strengthening and Widening to 2 Lane with Paved Shoulder from km. 0.00 to 10.903
|
10.90
|
28.04
|
16
|
327A
|
Strengthening & Widening to 2 Lane with Paved Shoulder from km. 0.00 to 25.010 on EPC mode
|
25.01
|
77.55
|
17
|
327E
|
Strengthening & widening work of existing 2-Lane to two lane with paved shoulder from Km. 93.612 to Km. 98.000
|
4.39
|
64.52
|
18
|
57A
|
4 laning of Forbesganj-Jogbani section of NH-57A
|
9
|
200
|
19
|
83
|
4 laning of Patna - Gaya - Dobi section of NH 83 with JICA ODA loan assistance
|
127
|
1231.98
|
20
|
80
|
Construction of Bhagalpur Bypass
|
13
|
268
|
Total
|
1055.25
|
9991.24
|
B. Projects in the Pipeline
Sl.No.
|
Project
|
Length (Km)
|
Cost (Rs. Crore)
|
1
|
4 laning of Mokama-Khagariya section of NH-31
|
60
|
810
|
2
|
Bridge at Munger
|
18.69
|
2361.87
|
3
|
Development to 2-laned with paved shoulder of Maheshughat-Saharsa-Purnia section of NH-107
|
171
|
1000
|
4
|
Development of Manjholi-Chirkot section
|
65
|
700
|
5
|
4/6 laning of Patna Ring Road
|
65
|
1500
|
6
|
4 laning of Kishanganj Bypass at NH-31
|
20
|
250
|
7
|
4-laning of Munger-Mirzachowki section of Nh-80
|
120
|
1200
|
8
|
Development to 2-lane with paved shoulder of sections on NH-2C, NH80, NH81, NH99 and NH527 A.
|
116
|
680
|
9
|
Construction of MG Setu with JICA assistance
|
5.6
|
2800
|
10
|
Construction of bridge across Kosi river an Km 136 of NH-106
|
20
|
3000
|
Ensuring Connectivity Across Major Rivers
| |||
11
|
Bridge on river Ganga connecting Manihari in Bihar to Sahibganj in Jharkhand
|
2000
| |
12
|
Bridge over river Sone connecting Panduka(Nauhata) on NH-2C in Bihar and Shrinagar(Garhwa District) in Jharkhand
|
2000
| |
13
|
A new 4-laned bridge on river Ganga parallel to existing MG Setu
|
5000
| |
14
|
Improving Connectivity- Declaration of New National Highway and its development
|
436.58
|
6600
|
15
|
New National Highway connecting Buxar on NH-84-Chausa-Ramgarh-Mohania on NH-2
|
64
|
960
|
Sl.No.
|
Project
|
Length (Km)
|
Cost (Rs. Crore)
|
Projects under “Bharatmala Programme”
| |||
16
|
Roads connecting Raxaul and Sonbarsa (Parallel to Indo-Nepal Border)
|
90
|
1800
|
17
|
Chakia- Bargainia connectivity
|
50
|
1000
|
Projects For Improving Connectivity Of Places Of Religious Interest
| |||
18
|
Development of Rampur -Khajuriya -Kesariya end of NH-722 to 4 lane standard
|
58
|
1160
|
19
|
Development of Umgaon-Basopatti-Benipatti-Rahua-Madhubani-Rampatti-Awam-Laufa-Bheja-Supaul-Mehsi-Saharsa which connects Uchchait Bhagwati Sthan to Mehsi Taraesthan to 2 lane with paved shoulder or 4-lane standard with a bridge over river Kosi
|
160
|
5000
|
20
|
Development of Ram-Janki Marg as already declared recently part of which falls in Bihar from UP Bihar Border to Siwan-Madhubani-Sitamarhi-Indo-Nepal Border to 4 lane standard
|
200
|
4000
|
Rail Over Bridge (ROB)
| |||
21
|
12 ROBs
|
900
| |
Total
|
1719.87
|
44721.87
| |
Grand Total for NH
|
2775.12
|
54713.11
|
II. RURAL DEVELOPMENT
| ||||
To complete about 22,500 km of PMGSY roads in Bihar
|
13820
| |||
III. Petroleum and Natural Gas
| ||||
1
|
The Barauni Refinery would be expanded from 6 million tons to 9 million tons
|
12000
| ||
2
|
A Polyproplene Recovery Plant for petro-chemical products would also be set up.
|
3500
| ||
3
|
The implementation of the 617 Kms pipeline relating to Bihar in Jagdishpur-Haldia pipeline
|
2300
| ||
4
|
Raxaul Amlekhganj pipeline
|
200
| ||
5
|
Extension of Paradip-Haldia- Durgapur LPG pipeline
|
1800
| ||
6
|
New LPG Plant at Muzaffarpur
|
110
| ||
7
|
Creation of additional capacity for LPG plant at Patna
|
15
| ||
8
|
Implementation of BS IV fuel at Barauni Refinery
|
1500
| ||
9
|
Augumentation of Patna LPG Plant from 60 to 120 TMTPA
|
45
| ||
10
|
Upgradation of Purnea LPG Plant
|
6
| ||
Total
|
21476
| |||
IV. CIVIL AVIATION
| ||||
1
|
Construction of a Greenfield Airport at Patna
|
2000
| ||
2
|
Development of Gaya Airport for Airbus 321-200 type of aircraft operations with new terminal building and apron, runway extension, CAT-I approach lighting
|
300
| ||
3
|
Development of Raxual Airport for ATR-72 / Q-400 type of aircrafts for VFR operations
|
250
| ||
4
|
Development of Civil Enclave at Purnea Airport for Airbus 321-200 type of aircraft
|
150
| ||
Total
|
2700
| |||
V. HIGHER EDUCATION
| ||||
1
|
Establishment of a Central University near Bhagalpur at the historic site of Vikramshila University
|
500
| ||
2
|
Establishment of IIM, Bodh Gaya
|
500
| ||
Total
|
1000
| |||
VI. SKILL DEVELOPMENT
| ||||
1
|
To train one lakh youth under Pradhan Mantri Kaushal Vikas Yojana
|
300
| ||
2
|
25,000 youth to be trained in Power sector
| |||
3
|
Mega Skill University in Bihar
|
1250
| ||
Total
|
1550
| |||
VII. AGRICULTURE
| |||
1
|
Upgradation of PUSA (Bihar) to the level of a Central Agricultural University
|
400
| |
2
|
Development of fisheries
|
200
| |
3
|
Farm Water Management (Micro irrigation, creation of water resources)
|
750
| |
4
|
Development of Storage Capacity
|
600
| |
5
|
Farm Mechanization
|
600
| |
6
|
Seed production systems
|
300
| |
7
|
National Research Centre on Integrated Farming System, Motihari, Bihar
|
30
| |
8
|
Construction of new godowns at Supaul, Madhepura, Hazipur and Chakia Bazar
|
214
| |
Total
|
3094
| ||
VIII. RAILWAYS
| |||
A. Doubling/Tripling of Railway Line
| |||
1
|
Rampur Dumra - Tal - Rajendrapul Addl Bridge and doubling - 14 Km length
|
938
| |
2
|
Hajipur - Bachwara - 72 kms
|
756
| |
3
|
Samastipur - Darbhanga 38 kms
|
399
| |
4
|
Kiul - Gaya 123 kms
|
1292
| |
5
|
3rd line between Dhanbad - Sonnagar (partly in Bihar ) - 429 kms
|
4725
| |
B. Railway Electrification
| |||
1
|
Kiul - Tilaiya 87 kms
|
85
| |
2
|
Valmikinagar - Narkatiaganj-Sugauli-Muzaffarpur including Sugauli-Raxaul 240 kms
|
397
| |
3
|
Ammapali Halt - Kiul including Tinpahar-Rajmahal (Part of Bonidanga link cabin/Bonidanga-Barharwa- Sahibgang-Kiul section incl Tinpahar-Rajmahal) Length 247 kms
|
279
| |
Total
|
8870
| ||
IX. POWER
| |||
1
|
Construction of 1300 MW Power plant at Buxar {PIB has recently appraised the project and recommended Rs. 437 cr as pre-investment activity to kick start the project.}
|
10000
| |
2
|
Deen Dayal Upadhyay Gram Vidyut Yojana
|
5880
| |
3
|
Under Integrated Power Development Scheme (IPDS).
|
250
| |
Total
|
16130
| ||
X. TELECOMMUNICATION – DIGITAL BIHAR
| |||
1
|
1000 new BTS (towers) to be installed in Bihar
|
250
| |
2
|
Setting up of 2 new STPI centres (Software Technology Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas. This will help in promoting the IT entrepreneurs and start ups in Bihar.
|
20
| |
3
|
Setting up 2 new NIELIT Centres in Muzaffarpur and Buxar apart from upgrading the existing centre in Patna, Medical Incubator at IIT Patna, Electronics and ICT Academy at NIT Patna.
|
14
| |
4
|
Electronic Manufacturing clusters in Bihar for which 50% subsidy for greenfield and 75 % subsidy for Brownfield EMCs are available.
|
150
| |
5
|
30 WiFi hotspots will be rolled out in Bihar, by BSNL at prominent tourist places such as Rajgir, Vaishali, Gaya, Nalanda and Patna
|
15
| |
Total
|
449
| ||
XI. TOURISM
| |||
1
|
Vaishali and Bodhgaya development alongwith other places in buddhist circuit including Vikramshla
|
200
| |
2
|
Sultanganj to Deoghar project
|
50
| |
3
|
Patna Sahib under Prasad
|
50
| |
4
|
Mahatma Gandhi Circuit
|
50
| |
5
|
Ramayan Circuit
|
100
| |
6
|
Jain Circuit including Champa puri
|
50
| |
7
|
circuit for Mandar Hills and Ang Pradesh
|
50
| |
8
|
IITTM chapter in Bihar
|
50
| |
Total
|
600
| ||
XII. HEALTH
| |||
1
|
Upgradation of 3 Medical colleges at Patna, Bhagalpur & Gaya under PMMSY in Bihar
|
600
| |
Grand Total of the Package
|
1,25,003
| ||
· Income Tax Relief on new capital investment in the form of Additional Investment Allowance and Higher Additional Depreciation for investment in backward areas of Bihar
Other Investments : Rs.40,657 crore
1. Unspent amount of 2013 Special Plan (of Rs.12,000 crore) : Rs.8,282 crore
2. Ongoing works of National Highways : Rs.12,375 crore
3. Ultra Mega Power Project (UMPP) in Banka under PPP : Rs.20,000 crore
No comments:
Post a Comment