The details of the Allocation under Special Accelerated Development Programme in North- Eastern Region during last three years, year-wise:
Year
|
SARDP-NE (Allocation)
(Rs. in crore)
|
2011-12
|
1950
|
2012-13
|
1845
|
2013-14
|
2994
|
The details of the work sanctioned during the last three year, year-wise is as under:
During 2011-12
| |||||
Sl. No.
|
Project Name
|
State
|
Length
(km)
|
Cost (In Rs. Cr)
|
Physical Progress
(%)
|
1.
|
2 laning from Nechipu to Hoj on BOT (Annuity) on NH-229
|
Arunachal Pradesh
|
311
|
1486
|
17.40
|
2
|
2 laning of NH-52B from Tissa-Longding-Khonsa bypass
|
Arunachal Pradesh
|
42.5
|
156.83
|
35.02
|
3
|
Improvement to double lane standards from km 806.75 to 832.00 of NH 52
|
Arunachal Pradesh
|
25.25
|
67.06
|
56.44
|
4
|
2 laning from Potin to Pangin on BOT (Annuity) on NH-229
|
Arunachal Pradesh
|
407
|
1985
|
0.00
|
5
|
2 laning Yinkion to Gobuk from km 0.000 (Yingkiong) to 25.200 (Gobuk) (Existing ch.0.00 to km 26.00) (net length=25.200 km)
|
Arunachal Pradesh
|
25.20
|
106.25
|
33.04
|
6.
|
Improvement to double lane standards from km 0.00 to km 17.714 (Exist Km. 0.00 to Km 20.00) of Joram to Koloriang road
|
Arunachal Pradesh
|
17.714
|
106.9
|
26.85
|
7
|
Widening and strengthening of NH-52 from km 689.800 to 705.262 (Digaru-Tezu) to 2-lance standards
|
Arunachal Pradesh
|
15.485
|
53.74
|
25.57
|
8
|
Widening and strengthening of NH-52 from km 705.285 to km 717.675 (Tezu-Demwe) to 2-lance standards.
|
Arunachal Pradesh
|
12.39
|
38.14
|
19.53
|
9
|
2 laning Gobuk to Sijhon Nalla from Km26.210 (Gobuk) to 75.485 (Sijhon Nallha) (Existing ch.27.000-75.000) (net length = 49.275 km)
|
Arunachal Pradesh
|
49.275
|
207.03
|
17.36
|
10
|
Construction/improvement of Kumarghat – Kailashhar road to NHDL Tripura specification from km 0.00 (Kumarghat) to km. 24.775 (Kailashahar)
|
Tripura
|
24.775
|
90.75
|
22.00
|
11
|
Construction of new 2-lane roaod with paved shoulders Katticherra bypass from km.47.00 to km 52.00 of NH-154
|
Assam
|
5
|
48.38
|
59.60
|
12
|
Construction of new 2 lance road with paved shoulders from km.0.00 to km 3.500 of NH-154
|
Assam
|
3.5
|
53.15
|
76.66
|
13
|
Widening/strengthening of existing intermediate lance Goalpara-Solmari road to 2-lane Highways
|
Assam
|
7.9
|
14.58
|
40.50
|
14
|
Widening/strengthening of existing intermediate lane Barpeta-Howly road to 2-lance Highway (Length = 12.10 km)
|
Assam
|
12.1
|
22.63
|
91.00
|
15
|
Widening/strengthening of existing intermediate lane road to 2-lane highway from Rangajan Tinali (30th km of NH 30 ) to Golaghat Town (Length = 7.0 km)
|
Assam
|
7
|
11.59
|
Completed
|
16
|
Widening and strengthening of existing NH-31 A to double lane (Sevoke-Gangtok road) between km 4.475 to 14.075
|
West Bengal
|
8.88
|
51.11
|
45.24
|
17
|
Construction of 2-lance bypass at 9thmile of NH 31A
|
Sikkim
|
6.2
|
25.67
|
17.50
|
18
|
Construction of roadf from km 69.90 to 72.075 of NH 31A (Kapoor More) to NH double lane specification
|
Sikkim
|
2.175
|
10.49
|
6.00
|
Total (2011-12)
|
983
|
4535
| |||
During 2012-13
| |||||
1
|
2 laning of Akajan-Likabali Bame road from km 97.00 to km 105.62 (new location km 103.174) (net length = 6.174 km) Basar-Bame)
|
Arunachal Pradesh
|
6.17
|
33.39
|
12.92
|
2
|
Widening/Strengthening of existing intermediate lane Gauripur-Dubhri Road to 2 lane Highway (length = 8.529 km)
|
Assam
|
8.59
|
22.09
|
85.00
|
3
|
Construction of new 2-lane road with paved shoulders to bypass Hilakandi town between km 18.800 and 26.00 of NH-154
|
Assam
|
9.75
|
48.48
|
43.10
|
4
|
Construction of two lane Melli-Manpur-Namchi road
|
Sikkim
|
32
|
182.28
|
18.00
|
5
|
Tender based estimate for 2 laning of Akajan-Likabali-Bame road from km.0.00 to km 12.00 (Akajan-Likabali)
|
Assam
|
12
|
32.62
|
20.75
|
Total (2012-13)
|
69
|
319
| |||
During 2013-14
| |||||
1
|
Construction of 2 lane Jowai bypass between km 54.200 and km 69.200 (length = 7.997 km ) on NH-44
|
Meghalaya
|
7.997
|
46.62
|
9.00
|
2
|
Construction of two lane Nayabazar-Legship road
|
Sikkim
|
23.81
|
151.59
|
3.00
|
3
|
Construction of two lane Tarku-Damthang –Namchi Road
|
Sikkim
|
31.77
|
166.27
|
4.00
|
Total (2013-14)
|
64
|
364
|
The Government under Special Accelerated Road Development Program-North East (SARDP-NE) has approved 6418 km length (Net length is 6137 km, based on Detailed Project Report) for implementation under Phase ‘A’ and the Arunachal Pradesh Package of Roads and Highways. The length sanctioned so far is 3924 km and completed length is 1584 km. The balance length is 2213 km and out of which 1913 is targeted for award during 2014-15 and balance 300 km during 2015-16.
This was stated by General (Retd.) Dr. V K Singh, the Minister of State (Independent Charge) for Development of North East Region in Lok Sabha today.
Courtesy: pib.nic.in