A total number 3568 villages/hamlets have been electrified through renewable energy systems/devices and an amount ofRs. 158.81 crores have been released during the last three years under the remote villages electrification programmes of the Ministry.
Under the Off-gird Solar Applications Scheme of Jawaharlal Nehru National Solar Mission, so far, 40 stand-alone SPV power plants with aggregating Capacity of 826 kWp and mini-grid concept have been installed.
State-wise details are as follows:
|
S. No.
|
States
|
No. of villages
|
Total Capacity inkWp
|
|
1.
|
Jammu & Kashmir
|
14
|
454.16
|
|
2.
|
Jharkhand
|
12
|
180.18
|
|
3.
|
Madhya Pradesh
|
8
|
90.18
|
|
4.
|
Utter Pradesh
|
6
|
102.06
|
|
S. No.
|
State
|
Villages/Hamlets electrified during last 3
years
|
Funds released during last 3 years
(Rs. In Lakh)
|
|
1.
|
Andhra
Pradesh
|
13
|
7.4
|
|
2.
|
Arunachal Pradesh
|
51
|
|
|
3.
|
Assam
|
1017
|
876.87
|
|
4.
|
Chhattisgarh
|
169
|
|
|
5.
|
Haryana
|
92
|
|
|
6.
|
Himachal Pradesh
|
20
|
|
|
7.
|
Jammu
& Kashmir
|
189
|
3896.75
|
|
8.
|
Jharkhand
|
44
|
1395.7
|
|
9.
|
Kerala
|
49
|
|
|
10.
|
Madhya
Pradesh
|
327
|
1490.12
|
|
11.
|
Maharashtra
|
2
|
501.267
|
|
12.
|
Manipur
|
49
|
|
|
13.
|
Meghalaya
|
52
|
|
|
14.
|
Nagaland
|
8
|
76.05
|
|
15.
|
Orissa
|
726
|
2904.05
|
|
16.
|
Rajasthan
|
90
|
842.59
|
|
17.
|
Tamil Nadu
|
30
|
|
|
18.
|
Tripura
|
441
|
444.84
|
|
19.
|
Uttarakhand
|
88
|
197.26
|
|
20.
|
Uttar
Pradesh
|
105
|
1721.14
|
|
21.
|
West
Bengal
|
6
|
1447.61
|
|
22.
|
Delhi*
|
|
24.96
|
|
23.
|
Goa
|
|
9.74
|
|
24.
|
Gujarat
|
|
35.27
|
|
25.
|
Karnataka
|
|
9.82
|
|
|
Total
|
3568
|
15881.42
|
This information was given by the Minister of New and Renewable Energy Dr Farooq Abdullah in the Rajya Sabha (Aug 20, 2013).
Courtesy: (pib.nic.in) Press Information Bureau
No comments:
Post a Comment