Brief Analysis of Power Generation from April 2012-February 2013.

Total Generation during the period April 2012-February 2013 has been 831.44 Billion Units which is 104.02% of the actual generation during the same period last year. The generation during April 2011-February 2012 as compared to the corresponding period of the previous year was 108.66%. 

So for as actual generation with reference to the Programme during the above period is concerned, Hydro generation has been 92.01% of the programme and Nuclear generation has been 95.03% of the programme however Thermal generation has been 99.46% of the programme. 

The possible total generation during April 2012-February 2013 would have been 896.90 Bus (loss of generation, considering 90% PLF is 65.46 Bus) which would have resulted in achievement of 105.97% instead of 98.23% over programme. 

No comments:

Extension of Emergency Credit Line Guarantee Scheme through ECLGS 2.0 for the 26 sectors identified by the Kamath Committee and the healthcare sector

Extension of the duration of Emergency Credit Line Guarantee Scheme (ECLGS) 1.0 The Government has extended Emergency Credit Line Guarantee ...