Pradhan
Mantri Gram Sadak Yojana (PMGSY), a flagship scheme of the Ministry of Rural
Development will achieve the annual targeted length of 48,812 kilometers of
rural roads by 31st March, 2017, as the construction work picks up
from January to May every year. As on 27.01.2017, a total of 32,963kms. has
been completed which is 67.53% of the annual target. This translates to 111
kms. of roads getting constructed every day. According to the annual target
(48,812 kms.), the average per day construction should be 133kms per day. It
is important to realize that September to December are lean months for road
construction, whereas the construction picks up from January to May every
year. It is also important to underline that from April to August, 2016 PMGSY
had achieved an average per day construction of 139 kms. per day and therefore by
31st March, 2017 it will achieve the annual targeted length of
48,812 kms.
The
annual target of habitations in 2016-17 is 15,000 habitations, against which,
as on date (27.01.2017) 6,473 habitations have been connected. PMGSY would
also by 31st March, 2017, achieve the habitation target also.
Another
major achievement has been the focus of using “green” technologies and
non-conventional materials (waste plastic, cold mix, geo-textiles, fly ash,
copper and iron slag etc.) in construction of PMGSY roads because these are
locally available, low cost, non-polluting, labour friendly and fast
construction technologies / materials. In the first 14 years of PMGSY (from
2000 to 2014), only 806.93 kms. of roads were constructed using these
technologies / materials. In the last 2 years (2014-2016), 2,634.02 kms. of
PMGSY roads have been constructed using these technologies /materials. In the
present year (2016-17) till date (27.01.2017), 3,000 kms. have been constructed
using these technologies / materials.
It is also important to note that the
progress achieved so far till 27th January, in 2016-17 is far more
than what was achieved in the comparable period, in each one of the last 5
years (i.e. 2011 to 2016).
Achievement in respect of Length
and Habitations
Year (s)
|
Length completed (in km) upto
January
|
Habitations connected (in Nos.)
upto January
|
1
|
2
|
3
|
2011-12
|
21750
|
4142
|
2012-13
|
18080
|
5491
|
2013-14
|
16914
|
4670
|
2014-15
|
26650
|
8368
|
2015-16
|
25709
|
5903
|
2016-17
|
32963
|
6473
|
Total:
|
142067
|
35047
|
Courtesy: pib.nic.in