1. Crude Oil Production
1.1 Indigenous crude oil production (including condensate) during January, 2016 was 3037.537 TMT which is 4.34% lower than the target for the month and 4.64% lower than the production during corresponding period of last year. Cumulative crude oil production during April, 2015-January, 2016 was 30990.961 TMT which is 0.52% higher than target for the period and 1.17% lower than the production during corresponding period of last year. Unit-wise and state-wise crude oil production is given at Annexure-I. Unit-wise crude oil production (including condensate) for the month of January, 2016 and cumulatively for the period April, 2015-January, 2016 vis-à-vis same period of last year has been shown in Table-1.1 and month-wise in Figure-1.1
Table 1.1: Crude Oil Production (TMT)
Oil Company
|
Target
|
January (Month)
|
April-January (Cumulative)
| ||||||
2015-16 (Apr-Mar)
|
2015-16
|
2014-15
|
% over last year
|
2015-16
|
2014-15
|
% over last year
| |||
Target
|
Prod.
|
Prod.
|
Target
|
Prod.
|
Prod.
| ||||
ONGC
|
22732.00
|
1953.29
|
1832.29
|
1885.77
|
97.16
|
18888.05
|
18717.15
|
18609.04
|
100.58
|
OIL
|
3595.00
|
312.36
|
260.36
|
288.67
|
90.19
|
2985.74
|
2710.97
|
2867.43
|
94.54
|
PSC Fields
|
10718.74
|
909.76
|
944.88
|
1011.00
|
93.46
|
8957.91
|
9562.84
|
9882.86
|
96.76
|
Total
|
37045.74
|
3175.41
|
3037.54
|
3185.44
|
95.36
|
30831.70
|
30990.96
|
31359.32
|
98.83
|

Figure-1: Monthly Crude Oil Production
1.2 ONGC’s crude oil production during January, 2016 was 1832.293 TMT which is 6.19% lower than the target for the month and 2.84% lower than the production achieved in the corresponding month of last year. ONGC’s cumulative production during April, 2015-January, 2016 was 18717.153 TMT which is 0.90% lower than the cumulative target and 0.58% higher than the production during the corresponding period of last year. The shortfall in ONGC’s production was due to following reason:
Ø Gujarat, Mehsana: Less Air injection in Santhal field, increasing water cut in down dip wells of N Kadi field, increase in water cut, increase in sick wells & power shut down.
Ø Gujarat, Ahmedabad: Delayed / less gain from Gamij Field. Power shutdown, lift optimization.
Ø Assam: Low Gas injection pressure, power shut down & closure of wells for rig-less jobs.
Ø Tamilnadu, Karaikal: Less than anticipated production from Madanam field & closure of wells due to less / nil off-take by consumers.
Ø Mumbai High: Delay in commencement of production from B127 cluster. Less production from Cluster-7 & WO-16 cluster.
Ø Condensate: Less condensate from Hazira Plant due to less gas receipt in view of less gas production from B & S Asset mainly because of BPA shutdown.
1.3 OIL’s crude oil production during January, 2016 was 260.361 TMT which is 16.65% lower than the target for the month and 9.81% lower than the production achieved in the corresponding month of last year. OIL’s cumulative production during April, 2015-January, 2016 was 2710.973 TMT which is 9.20% lower than the cumulative target and 5.46% lower than the production during the corresponding period of last year. Reasons for shortfall in production are given below:
Ø Rise in water cut in wells of Shalmari, Greater Chandmari and Greater Hapjan Fields.
Ø Permanent loss at Makum & Hapjan OCS.
Ø Major loss of production at Makum, Hapjan, Haveda and TX due to OIL blockade by All Moran Student Union, Makum Regional Committee on 27.01.2016.
Ø Miscreant activities in no. of wells affected gas lift operation leading to crude oil production loss.
Ø Less than planned contribution from workover & new wells
1.4 Pvt. /JVs’ crude oil production during January, 2016 was 944.883 TMT which is 3.86% higher than the target for the month and 6.54% lower than production of corresponding month of last year. Pvt./JVs’ cumulative production during April, 2015-January, 2016 was 9562.835 TMT which is 6.75% higher than the cumulative target and 3.24% lower than the production during the corresponding period of last year. Reasons for shortfall in production are given below:
Ø Cairn: Natural Decline in Ravva, Mangala & Underperformance of Bhagyam wells in RJ-ON-90/1
Ø RIL: Under performance of wells of KG D6 due to sand ingress and water loading.
Ø GSPC: Well Completion Issues in KG-OSN-2001/3
Ø Other: Due to Sand Ingression, High W/C and fish in few wells of Kharsang. Panna-Mukta carried out its planned shutdown for riser repair in April- May-15 and Gas Evacuation constraint in July’15 due to repair of 42” SB – HAZIRA ONGC Line. S/Dn in Dec-15 due to PPA riser issue.
2. Natural Gas Production
2.1 Natural Gas Production during January, 2016 was 2447.383 MMSCM which is 19.13% lower than the target for the month and 15.26% lower than the production during corresponding period of last year. Cumulative natural gas production during April, 2015-January, 2016 was 27144.548 MMSCM which is 7.64% lower than the target for the period and 4.03% lower than the production during corresponding period of last year. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of January, 2016 and cumulatively for the period April, 2015-January, 2016 vis-à-vis same period of last year has been shown in Table-2.1 and month-wise in Figure-2.1.
Table 2.1: Natural Gas Production (MMSCM)
Oil Company
|
Target
|
January (Month)
|
April-January (Cumulative)
| ||||||
2015-16 (Apr-Mar)
|
2015-16
|
2014-15
|
% over last year
|
2015-16
|
2014-15
|
% over last year
| |||
Target
|
Prod.
|
Prod.
|
Target
|
Prod.
|
Prod.
| ||||
ONGC
|
23908.00
|
2077.92
|
1530.86
|
1898.20
|
80.65
|
19861.43
|
18495.39
|
96.26
| |
OIL
|
3009.97
|
248.79
|
245.72
|
229.55
|
107.04
|
2519.57
|
2365.78
|
2287.85
|
103.41
|
PSC Fields
|
8361.91
|
699.55
|
670.80
|
760.53
|
88.20
|
7007.94
|
6975.76
|
7502.43
|
92.98
|
Total
|
35279.88
|
3026.26
|
2447.38
|
2888.28
|
84.74
|
29388.93
|
27144.55
|
28285.66
|
95.97
|

Figure-2.1: Monthly Natural Gas Production
2.2 ONGC’s natural gas production during January, 2016 was 1530.864 MMSCM which is 26.33% lower than the target for the month and 19.35% lower than the production achieved in the corresponding month of last year. ONGC’s cumulative natural gas production during April, 2015-January, 2016 was 17803.007 MMSCM which is 10.36% lower than the cumulative target and 3.74% lower than the production during the corresponding period of last year. Reasons for the shortfall are given below:
v Eastern Offshore: Delay in commencement of production from one deep water well (S2AB) planned in Eastern offshore from June’15 and restricted withdrawal by GAIL.
v Bassein & Satellite: Shutdown taken at BPA installation for carrying out reconstruction activities under on-going “Reconstruction of BPA & BPB Platforms” Project. Maintenance of one Booster compressor at BCPB2 installation since 13.12.15 (Overhauled and put in operation from 21.01.16).
v Gujarat: Closure of wells due to unplanned shut down of GAIL Gas line from Ahmedabad/Kalol to Ramol. Decline in associated gas production in South Kadi & Gamij fields
v Andhra Pradesh: Closure of 42 wells as GAIL pipelines in Tatipaka-Lanco & Endamaru-Oduru sections are still under repair.
v Tamilnadu: Closure of wells on account of less/ nil off-take by consumers in Ramnad area.
v Assam: Decline in associated gas production in Geleki & Lakwa fields.
v Tripura: Less off take due to stoppage of 2nd unit of OTPC.
2.3 OIL’s natural gas production during January, 2016 was 245.717 MMSCM which is 1.24% lower than the target for the month and 7.04% higher than the production achieved in the corresponding month of last year. OIL’s cumulative natural gas production during April, 2015-January, 2016 was 2365.778 MMSCM which is 6.10% lower than the cumulative target and 3.41% higher than the production during the corresponding period of last year. Reasons for the shortfall are given below:
v Shortfall in production of natural gas is mainly due to low upliftment by the consumers like BCPL, NTPS, and NRL etc.
2.4 Pvt. /JVs’ natural gas production during January, 2016 was 670.802 MMSCM which is 4.11% lower than the target for the month and 11.80% lower than the production achieved in the corresponding month of last year. Pvt. /JV’s cumulative natural gas production during April, 2015-January, 2016 was 6975.763 MMSCM which is 0.46% lower than the cumulative target and 7.02% lower than the production during the corresponding period of last year. Reasons for the shortfall are given below:
Ø RIL (KG-D6): Under performance of wells of KG D6 due to sand ingress and water loading.
Ø GSPC: Well completion issues in KG-OSN-2001/3
Ø Cairn: CB-OS/2: Non-associated gas producing well LB-7 watered out prematurely
Ø Other operators: Natural Decline in Gas production of Ravva, Panna-Mukta, PY-1 and Hazira. Panna-Mukta carried out its planned shutdown for riser repair in April- May-15 and Gas Evacuation constraint in July’15 due to repair of 42” SB – HAZIRA ONGC line, shutdown in Dec-15 due to PPA riser issue.
Ø CBM: Extended dewatering in Raniganj South (GEECL), Delayed forest clearance in Raniganj East (Essar).
3. Refinery Production (in terms of Crude oil processed):
3.1 Refinery production during January, 2016 was 20624.000 TMT which is 4.36% higher than the target for the month and 4.84% higher than the production during corresponding period of last year. Cumulative production during April, 2015-January, 2016 was 191334.665 TMT which is 2.32% higher than the target for the period and 2.67% higher than the production during corresponding period of last year. Unit-wise production is given at Annexure-III. Unit-wise production for the month of January, 2016 and cumulatively for the period April, 2015-January, 2016 vis-à-vis same period of last year has been shown in Table-3.1 and month-wise in Figure-3.1.
Table 3.1: Refinery Production (TMT)
Oil Company
|
Target
|
January (Month)
|
April-January (Cumulative)
| ||||||
2015-16 (Apr-Mar)
|
2015-16
|
2014-15
|
% over last year
|
2015-16
|
2014-15
|
% over last year
| |||
Target
|
Actual
|
Actual
|
Target
|
Actual
|
Actual
| ||||
IOCL
|
54999.99
|
4812.86
|
4885.21
|
4620.40
|
105.73
|
45720.82
|
46558.73
|
44701.65
|
104.15
|
BPCL
|
23197.00
|
2020.00
|
2061.90
|
2077.03
|
99.27
|
19387.00
|
19993.22
|
19213.10
|
104.06
|
HPCL
|
16199.88
|
1438.04
|
1605.63
|
1539.47
|
104.30
|
13416.73
|
14140.24
|
13265.78
|
106.59
|
CPCL
|
10800.10
|
948.46
|
951.05
|
945.14
|
100.63
|
8965.76
|
7762.49
|
9010.68
|
86.15
|
NRL
|
2700.00
|
242.00
|
233.93
|
223.94
|
104.46
|
2237.00
|
2081.11
|
2376.49
|
87.57
|
MRPL
|
15250.00
|
1500.00
|
1557.27
|
1354.58
|
114.96
|
12500.00
|
12671.53
|
11952.33
|
106.02
|
ONGC
|
60.88
|
5.35
|
6.77
|
3.25
|
208.51
|
50.46
|
52.47
|
42.18
|
124.40
|
BORL
|
5200.00
|
500.00
|
601.41
|
577.58
|
104.13
|
4200.00
|
5261.66
|
5221.86
|
100.76
|
HMEL
|
9000.00
|
762.30
|
817.90
|
719.35
|
113.70
|
7524.59
|
9077.15
|
5861.68
|
154.86
|
RIL
|
68041.55
|
5843.20
|
6121.40
|
5843.20
|
104.76
|
57575.30
|
58076.63
|
57575.30
|
100.87
|
EOL
|
18792.76
|
1690.90
|
1781.54
|
1768.41
|
100.74
|
15410.96
|
15659.44
|
17139.04
|
91.37
|
TOTAL
|
224242.16
|
19763.10
|
20624.00
|
19672.35
|
104.84
|
186988.62
|
191334.66
|
186360.10
|
102.67
|

Figure 3.1: Monthly Refinery Production (TMT)
3.2 PSU Refineries’ production during January, 2016 was 11301.753 TMT which is 3.06% higher than the target for the month and 5.00% higher than the production achieved in the corresponding month of last year. Cumulative production of PSUs during April, 2015-January, 2016 was 103259.785 TMT which is 0.96% higher than the cumulative target and 2.68% higher than the production during the corresponding period of last year. Reasons for shortfalls in PSU refineries are given below:
v IOCL, Gujarat: Throughput is restricted due deferment of CCRU S/D from Aug-15 to Jan-16 and lower North Gujarat Crude receipt.
v IOCL, Digboi: Throughput is restricted due to lower Assam crude availability.
v IOCL, Guwahati: Throughput is lower due to planned shutdown.
v CPCL, Manali: Crude throughput was lower due to VGO containment.
v NRL, Numaligarh: Lower receipt of Crude from OIL.
3.3 Production in JV refineries during January, 2016 was 1419.310 TMT which is 12.44% higher than the target for the month and 9.44% higher than the production achieved in the corresponding month of last year. Cumulative production in JV refineries during April, 2015-January, 2016 was 14338.814 TMT which is 22.30% higher than the cumulative target and 29.37% higher than the production during the corresponding period of last year.
3.4 Production in private refineries during January, 2016 was 7902.937 TMT which is 4.90% higher than the target for the month and 3.83% higher than the production achieved in the corresponding month of last year. Cumulative production in private refineries during April, 2015-January, 2016 was 73736.066 TMT which is 1.03% higher than the cumulative target and 1.31% lower than the production during the corresponding period of last year.
3.5 Refinery-wise details of the capacity utilization and Production of petroleum products during the month of January, 2016 and cumulatively for the period April, 2015-January, 2016 vis-à-vis April, 2014-January, 2015 are given at Annexures-IV and V respectively.
No comments: